SIMULATION ONLYFront-end prototype
Skip to main content
Industrial Projects · Structure and launch a project with INDUNV AI Assistant

Turn an industrial goal into connected work packages.

Industrial Projects covers connected industrial work — a new factory, a production line, an upgrade, or a product or device — as work packages, responsibilities, inputs and acceptance stages. A project can have one provider or several; its defining feature is coordinated work, not a high price alone.

Simulated

Project intake is simulated in this prototype — nothing is created or sent.

AI-assisted drafting

Requires sign-in and an active paid subscription. Manual project creation is proposed; its availability is an open decision.

Project templates

A template helps you describe a goal — it does not force a technical classification before you can start.

New Factory

Production requirements, equipment, facilities and startup coordination

New / Expanded Production Line

Additional capacity and connected installation work

Existing Factory Upgrade

Equipment, process and system improvement

Automation & Robotics

Controls, robotics, sensors, integration and commissioning

Inspection & Quality

Cameras, models, interfaces and acceptance testing

Digital Transformation & Integration

Machines, data and software across work packages

Product / Device Development

Requirements, design, prototype and test

Transition to Production

Tooling, manufacturing, assembly and inspection

Custom Industrial Project

An industrial objective outside the templates

Worked example — develop an industrial device

  1. Project brief
  2. Requirements
  3. Mechanical / electronic design
  4. Prototype
  5. Test / refine
  6. Tooling
  7. Part / PCB production
  8. Assembly
  9. Final test
  10. Documentation
Marketplacesupplies components
Industrial Servicessupplies design and manufacturing work
Industrial Projectscoordinates dependencies and overall acceptance

The integration owner is explicit — someone owns the fit between enclosure and PCB design, and the interface between the vision system and the factory controls. The assistant does not become responsible for execution because it proposed the plan.

Project stages

  1. Draft
  2. Requirements clarification
  3. Open for proposals
  4. Proposal review
  5. Scope / providers approved
  6. Execution
  7. Integration / acceptance
  8. Completed / closed

On hold, delayed, cancelled and disputed states are tracked separately. Package acceptance differs from overall project acceptance — several individually accepted components can still fail the integration test.

INDUNV AI Assistant in projects

May help with

Clarify the need, structure the brief, suggest filters, identify missing inputs, propose work packages, summarise actual proposals and surface open decisions.

Never does

It does not manufacture credentials, select a supplier, approve a price, transmit a confidential file or accept a delivery. Every AI-created brief or plan stays an editable draft — the human reviews and sends.

Access: sign-in and an active paid subscription. Subscription access does not include the price of expert services, manufacturing, equipment or project execution — those have separate agreed scopes and prices.

Pathway 2 · Smart Manufacturing · Industry 4.0

Where your factory stands
and what your next step is.

An assessment of eight capabilities that tells you what to develop and in what order — then connects you to the right products, services and delivery partners inside INDUNV.

Eight capabilities · three pillars Advisory guidance — not a certificate
STEP 1
Assessment
STEP 2
Readiness Index
STEP 3
Recommendations
STEP 4
ROI + simulation
STEP 5
Roadmap
MODULE 01

Factory Readiness Assessment

Start with a short factory profile, then place your factory on the ladder one capability at a time — plain-language statements, no numbers to estimate. Free gives you the three audited questions per capability; Professional adds depth, notes and evidence, source-bound recommendations and the Industrial Passport record. You get where you are, the next achievable state, your target and the first practical action. The assessment starts neutral: nothing is pre-filled unless you press “Load demo data”.

🏭 Factory profile step 0 · who you are + what you actually measure
Which of these do you actually measure? pick “Unknown” freely — honesty beats guessing
“Measured” = you have records · “Estimate” = your best guess · “Unknown” = we won't invent it. ROI quality follows data quality.
A simple path: 1) choose the capability you want to develop, then 2) answer the practical questions — select the statement that sounds like your factory, or skip what you don't know. We translate the choices in the background and show where you are, what's next, your target and the first practical action.
Each completed capability gives an immediate focused result. Complete all 8 for the full InduNv Readiness Index — your data answers set the honesty confidence, and nothing is assumed from the demo company.
📷 Visual Shop-Floor Scan optional · AI reads your photos and identifies capabilities to review — photos never answer the assessment for you AI not connected yet · guided
Drag factory photos here, or
Up to 4 images · guided mode keeps them 100% in your browser · live-AI mode transmits them to the configured AI endpoint only after you approve the privacy notice
Dual-engine · The platform gives AI-assisted recommendations, backed by a transparent readiness-scoring model. If the network is unavailable during a pitch, the transparent model runs the full flow with identical structure — no black box, no single point of failure.
Not a certification · INDUNV-FRA 1.0 is INDUNV's own readiness model — an indicative assessment that shows where a factory stands and what to do next. It is not an accredited audit and issues no certificate. Every capability, question and statement is INDUNV's own wording, written for this platform.
🧭 Methodology — how INDUNV-FRA 1.0 scores a factory Our own readiness model, written for this platform. Open if you want to see exactly how a result is computed. Show details ▾
MODULE 07

INDUNV Factory Readiness Assessment — the model

INDUNV-FRA 1.0 is INDUNV's own instrument: eight capabilities in three pillars, six descriptive stages, and one transparent formula. It is an indicative pre-assessment that shows where a factory stands and what to do next. It is not an accredited audit and issues no certificate.

8 × 3

Capabilities and pillars

Technology · Process · Organisation

Shop-floor connectivity, Data & intelligence and Automation form the Technology pillar; Operations integration, Quality management and Maintenance maturity the Process pillar; Talent readiness and Strategy & governance the Organisation pillar.

Weights: Technology 0.40 · Process 0.35 · Organisation 0.25.
A → F

Six stages

Unseen · Written down · On screen · Joined up · Ahead of the fault · Runs itself

Every question offers six descriptive statements — no numbers to estimate. The factory picks the one that sounds like its floor, or skips what it does not know. A skipped answer is excluded and lowers confidence; it is never guessed.

Stage per capability: round(0.8 × average + 0.2 × lowest) over the scored answers.
IRI

InduNv Readiness Index

A weighted composite with a weakest-pillar drag

IRI = 0.75 × the pillar-weighted average + 0.25 × the weakest pillar, on a 0–5 scale. A separate floor level applies the strict rule that every pillar must reach a level before it counts. Confidence is honesty-gated: it follows what was measured, what was estimated and what was skipped.

Form 1.0-S (Free, three questions per capability) or 1.0-F (Professional depth) is stamped on every result.
sig

One identity, four states

Answer signature · Industrial Passport record

Every result carries an answer signature computed by one function from the answers and skips only — notes and evidence sit outside it. The passport record moves through four states: current readiness → planned uplift → observed uplift after reassessment → independently verified uplift. A purchase is recorded and never touches the score.

Recommendations are source-bound: platform records only, never an invented match.
Why our own model · Formal maturity programmes are powerful — and heavyweight by design: scheduled multi-day on-site engagements with certified assessors. INDUNV-FRA 1.0 is the fast, honest front door: a factory can place itself on the ladder in minutes, see its first practical action, and build evidence on the platform before any formal engagement. When a factory later wants a formal audit, its INDUNV passport and evidence trail travel with it.
METHOD

Why the numbers hold up

Scoring = one transparent formula

Every stage, weight and gate is published above and computed in the browser — nothing hidden, nothing borrowed. The same numbers can be recomputed by hand from your answers.

ROI = benchmarks

Downtime, scrap and cost effects use published ranges — McKinsey (downtime −30–50%) and the Deloitte Analytics Institute (breakdowns −70%, maintenance cost −25%) — applied conservatively to the factory's own figures, with assumptions shown and editable, in three scenarios.

Market = real

~400M SMEs exist worldwide, ≈90% of all firms (World Bank, SME Finance). The SME manufacturing-operations-management software segment was US$6.69B in 2024, ~21.4% CAGR to 2033 (Grand View Research, Horizon). The wedge: enterprise platforms are priced for giants — SMEs are underserved.

Prioritisation = gap-to-ambition logic · Good transformation programmes don't conclude "buy the most technology" — they rank a short list of priority dimensions by weighing gap-to-ambition against company pain relevance. Navigator applies the same direction × focus logic at solution level — and gates it by data readiness.
Factory 4.0 Navigator
Optional demo case (food packaging) available via “Load demo data” · model applies to any SME manufacturing sector.
Grounded in recognised readiness standards ROI · McKinsey / Deloitte benchmarks Market · World Bank / Grand View Research